Skip to main content
Planned — not available yet Each guide walks one job from its first step to the evidence it leaves behind. Read them as a description of the workflow Nitsor is meant to support, not as instructions you can follow in a product today. Status: mostly a target contract. Three of the four guides describe behavior that is not available as a released product. Only the limited annotation editor described in the first guide exists, and only inside an agreed design-partner workspace.

The four guides

How to read a guide

Every guide separates what a person does from what the system records, because the record is what makes the work reviewable later. Where a step has no implementation, the guide says so in the step rather than in a footnote. Use a guide as a worksheet against your own process. The steps you cannot answer for your current workflow are the evidence gaps worth discussing, whether or not you ever adopt Nitsor.

Common mistake

Do not treat a complete guide as proof that the product path exists. A finished description is a target contract; the capability status matrix is the register that says what is built.

Next step

Start with the guide closest to the work you already do, then use Design-partner onboarding to define the smallest evaluation that could produce trustworthy evidence.
OutcomeCompare one of your own workflows against the intended Nitsor workflow and name the gaps.
AvailabilityPlanned — not available yet
AudienceAnnotators and reviewers, Technical program managers, ML, data, and software teams, Evaluators
PrerequisitesRead Product status; Know the concept vocabulary
Last verified2026-08-23